Comparison of Old and New Process
Op. #10
? Mill Joint Face
? Drill/Bore 16 Holes
? Drill/Bore Bolt Holes
Op. #30
? Drill Main Bearing Bolt Holes
Op. #50
? Press 8 Dowels in BP
? Assemble BP to Block
? Load BP Bolts
? Torque BP Bolts
Op. #100
? Semi-finish crank bores
? Finish crank bores
Op. #10
? Mill Joint Face
? Drill/Bore 3 Peg Holes
? Drill/Bore Bolt Holes
(3 V Features)
Op. #30
? Drill Main Bearing Bolt Holes
Op. #50
? Press 3 Pegs in BP
? Assemble BP to Block
? Load BP Bolts
? Torque BP Bolts
Op. #100
? Semi-finish crank bores
? Finish crank bores
With Dowel Pins
Kinematic Coupling